UP - logo

Search results

Basic search    Expert search   

Currently you are NOT authorised to access e-resources UPUK. For full access, REGISTER.

1 2
hits: 14
1.
  • THE APPLICATION OF A STOCKP... THE APPLICATION OF A STOCKPILE STOCHASTIC MODEL INTO LONG-TERM OPEN PIT MINE PRODUCTION SCHEDULING TO IMPROVE THE FEED GRADE FOR THE PROCESSING PLANT
    Gholamnejad, Javad; Azimi, Ali; Lotfian, Reza ... Rudarsko-geološko-naftni zbornik, 01/2020, Volume: 35, Issue: 4
    Journal Article
    Open access

    This paper presents a chance-constrained integer programming approach based on the linear method to solve the longterm open pit mine production scheduling problem. Specifically, a single stockpile ...
Full text

PDF
2.
  • On the accuracy of higher o... On the accuracy of higher order displacement discontinuity method (HODDM) in the solution of linear elastic fracture mechanics problems
    Abdollahipour, Abolfazl; Marji, Mohammad Fatehi; Bafghi, Alireza Yarahmadi ... Journal of Central South University, 11/2016, Volume: 23, Issue: 11
    Journal Article
    Peer reviewed

    The higher order displacement discontinuity method (HODDM) utilizing special crack tip elements has been used in the solution of linear elastic fracture mechanics (LEFM) problems. The paper has ...
Full text
3.
  • Development of a model for ... Development of a model for analysis of slope stability for circular mode failure using genetic algorithm
    Manouchehrian, Amin; Gholamnejad, Javad; Sharifzadeh, Mostafa Environmental earth sciences, 02/2014, Volume: 71, Issue: 3
    Journal Article
    Peer reviewed

    Slope stability estimation is an engineering problem that involves several parameters. The interactions between factors that affect slope instability are complex and multi-factorial, so often it is ...
Full text
4.
  • Effective solution of the l... Effective solution of the long-term open pit production planning problem using block clustering
    Lotfian, Reza; Gholamnejad, Javad; Mirzaeian Lardkeyvan, Yousef Engineering optimization, 07/2021, Volume: 53, Issue: 7
    Journal Article
    Peer reviewed

    Production planning of an open pit mine is defined as determining the extraction sequence of blocks in the final pit limit with the goal of maximizing Net Present Value (NPV) while considering the ...
Full text
5.
  • Time-dependent crack propag... Time-dependent crack propagation in a poroelastic medium using a fully coupled hydromechanical displacement discontinuity method
    Abdollahipour, Abolfazl; Marji, Mohammad Fatehi; Bafghi, Alireza Yarahmadi ... International journal of fracture, 05/2016, Volume: 199, Issue: 1
    Journal Article
    Peer reviewed

    Many problems in subsurface rocks which are naturally filled with saturated cracks and pores (with one or more fluid phases) are better understood in a poroelastic framework. Displacement ...
Full text
6.
  • Simulating the propagation ... Simulating the propagation of hydraulic fractures from a circular wellbore using the Displacement Discontinuity Method
    Abdollahipour, Abolfazl; Fatehi Marji, Mohammad; Yarahmadi Bafghi, Alireza ... International journal of rock mechanics and mining sciences (Oxford, England : 1997), December 2015, 2015-12-00, Volume: 80
    Journal Article
    Peer reviewed

    Hydraulic fracturing as applied to well stimulation is analyzed. Propagation of one or more hydraulic fractures from a wellbore that is oriented with either the maximum or intermediate principal in ...
Full text
7.
  • Application of artificial n... Application of artificial neural networks to the prediction of tunnel boring machine penetration rate
    JAVAD, Gholamnejad; NARGES, Tayarani Mining science and technology (China), 09/2010, Volume: 20, Issue: 5
    Journal Article

    Rate of penetration of a Tunnel Boring Machine(TBM) in a rock environment is generally a key parameter for the successful accomplishment of a tunneling project.This paper presents the results of a ...
Full text
8.
  • PRIMJENA STOHASTIČKOGA MODE... PRIMJENA STOHASTIČKOGA MODELA NA ODLAGALIŠTU JALOVINE KAO POTPORA DUGOROČNOJ PROIZVODNJI U OTVORENOME KOPU S CILJEM POVEĆANJA POSTOTKA RUDE U OBRADBI
    Gholamnejad, Javad; Azimi, Ali; Lotfian, Reza ... Rudarsko-geološko-naftni zbornik, 11/2020, Volume: 35, Issue: 4
    Journal Article, Paper
    Open access

    Rad prikazuje uporabu vjerojatnosnoga cjelobrojnog programiranja, temeljenoga na linearnome algoritmu, za dugoročno rješavanje proizvodnje u rudniku otvorenoga kopa. Obrađeno je jedno odlagalište ...
Full text

PDF
9.
Full text

PDF
10.
  • A complete formulation of a... A complete formulation of an indirect boundary element method for poroelastic rocks
    Abdollahipour, Abolfazl; Fatehi Marji, Mohammad; Yarahmadi Bafghi, Alireza ... Computers and geotechnics, April 2016, 2016-04-00, 20160401, Volume: 74
    Journal Article
    Peer reviewed

    Rocks are naturally filled with cracks and pores that are saturated with one or more fluid phases. Many problems in rock mechanics, petroleum engineering, geophysics, etc. deal with cracks and ...
Full text
1 2
hits: 14

Load filters