UP - logo
Public Library Srečko Vilhar, Koper - all departments (SIKKP)
Kaj pomenijo naše oznake?

PP – prosti pristop: gradivo se nahaja na Trgu Brolo 1
SKPP in SKN – gradivo se nahaja v skladišču, potrebno ga je naročiti
  • Ahilova pesem : roman
    Miller, Madeline
    Type of material - novel ; adult, general
    Edition - 1. natis
    Publication and manufacture - Ljubljana : Sanje, 2022
    Language - slovenian
    ISBN - 978-961-274-707-7; 978-961-274-706-0
    COBISS.SI-ID - 108415747

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Ankaran
available - outside loan, loan period: 21 days
Potujoča knjižnica
in mobile library 1: available - outside loan, loan period: 1 months
Markovec
available - outside loan, loan period: 21 days
Oddelek za odrasle
to view all reservation options, click the "reserve" button
Semedela
available - outside loan, loan period: 21 days
Pionirski oddelek
to view all reservation options, click the "reserve" button
Oddelek za odrasle paketnik
on loan - outside loan, due date: 16.09.2024
Expected to be available after: 10.09.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Ankaran 82-311.6 MILLER Ahilova pesem Ankaran 82-311.6 MILLER Ahilova pesem available - outside loan, loan period: 21 days
Potujoča knjižnica 82-311.6 MILLER Ahilova pesem Potujoča knjižnica 82-311.6 MILLER Ahilova pesem in mobile library 1: available - outside loan, loan period: 1 months
Markovec 82-311.6 MILLER Ahilova pesem Markovec 82-311.6 MILLER Ahilova pesem available - outside loan, loan period: 21 days
Semedela 82-311.6 MILLER Ahilova pesem Semedela 82-311.6 MILLER Ahilova pesem available - outside loan, loan period: 21 days
Oddelek za odrasle PP 82-311.6 MILLER Ahilova pesem Oddelek za odrasle PP 82-311.6 MILLER Ahilova pesem on loan - outside loan, due date: 16.09.2024

Expected to be available after: 10.09.2024 (1. in queue)
Oddelek za odrasle PP 82-311.6 MILLER Ahilova pesem Oddelek za odrasle PP 82-311.6 MILLER Ahilova pesem on loan - outside loan, due date: 14.08.2024

Expected to be available after: 10.09.2024 (1. in queue)
loading ...
loading ...
loading ...