University of Primorska University Library - all departments (UPUK)
-
Interfacial bond strength of epoxy and PUR adhesively bonded timber-concrete composite joints manufactured in dry and wet processesGiv, Ali Nemati ...This paper investigated the shear bond strength of adhesively bonded timber-concrete composite (TCC) joints between spruce wood and cast-in-situ concrete (i.e., TCC joint produced in wet bond ... process), and between spruce wood and prefabricated concrete (i.e., produced in dry bond process). Two types of adhesive including two-component polyurethane (PUR) and two-component epoxy were used for bonding wood and the concrete blocks. In fabrication of the wet bond TCC joints, three waiting times defined as the interval times between the starting time of adhesive cross-linking process and starting time for pouring fresh concrete were considered for both PUR and epoxy adhesives. These three waiting times were 0, 0.5tgel and tgel in which tgel represents the gelation time of the corresponding PUR and epoxy measured by oscillatory test. The wet TCC joints manufactured at 0, 0.5tgel and tgel waiting times and the dry TCC joints were tested under shear load to obtain their shear strength. The values of the shear strength of the wet and dry bond TCC joints were discussed, compared and correlated with respect to the failure modes. The experimental results showed that the average shear strength of wet bond TCC joints bonded with PUR and epoxy both reduced by around 47% when increasing the waiting time from 0 to tgel. It should be attributed to that the adhesives tended to have a weaker bond with cast-in-situ concrete at a longer waiting time, based on optical microscopy observations. Both PUR and epoxy bonded dry TCC joints possessed similar average shear strength and identical failure modes, i.e., failure in adhesive area and small portion of concrete fracture. Moreover, the use of epoxy in wet bond TCC joints led to higher shear strength than that in the dry bond TCC joints, while this trend was conversely observed in PUR bonded wet and dry TCC joints.Source: Construction & building materials. - ISSN 0950-0618 (Vol. 311, art. 125356, 2021, str. 1-16)Type of material - article, component part ; adult, seriousPublish date - 2021Language - englishCOBISS.SI-ID - 150617603
source: Construction & building materials. - ISSN 0950-0618 (Vol. 311, art. 125356, 2021, str. 1-16)
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Giv, Ali Nemati | |
Fu, Qiuni | |
Yan, Libo | |
Kasal, Bohumil | 50807 |
Source: Personal bibliographies
and: SICRIS
Select pickup location:
Material pickup by post
Delivery address:
Address is missing from the member's data.
The address retrieval service is currently unavailable, please try again.
By clicking the "OK" button, you will confirm the pickup location selected above and complete the reservation process.
By clicking the "OK" button, you will confirm the above pickup location and delivery address, and complete the reservation process.
By clicking the "OK" button, you will confirm the address selected above and complete the reservation process.
Notification
Automatic login and reservation service currently not available. You can reserve the material on the Biblos portal or try again here later.
Subject headings in COBISS General List of Subject Headings
Select pickup location
The material from the parent unit is free. If the material is delivered to the pickup location from another unit, the library may charge you for this service.
Pickup location | Material status | Reservation |
---|
Reservation in progress
Please wait a moment.
Reservation was successful.
Reservation failed.
Reservation...
Membership card:
Pickup location: