UP - logo
Univerza na Primorskem Univerzitetna knjižnica (UPUK)
  • Design and construction of a temporary test facility for sound insulation measurements of doors [Elektronski vir]
    Šubic, Nika ...
    To fulfill the sound insulation requirements for separating elements in buildings a common concern is reaching sufficient sound insulation of smaller construction elements, such as doors. Besides the ... construction of the door leaf, achieving quality sealing of the door leaf with the frame and floor is important as well as the on-site execution, which can greatly impact the final sound insulation of the whole separating element. To optimize the design of doors regarding sound insulation, repetitive testing is required which can be time consuming and expensive when performed on a different location by an external contractor. To facilitate the process for a Slovenian company, a temporary test facility was designed on their premises. The test facility was constructed in the existing building of the company using lightweight materials. The design and construction followed the requirements of the ISO 10140 standard, and the finished test facility can test door specimens with sound reduction index values of up to 56 dB.
    Vrsta gradiva - prispevek na konferenci ; neleposlovje za odrasle
    Leto - 2023
    Jezik - angleški
    COBISS.SI-ID - 179157507