Schaller, Jeffrey; Valente, Jorge M. S.
International journal of production research, 09/2022, Letnik: 60, Številka: 18Journal Article
Scheduling jobs in a no-wait flow shop with the objective of minimising total earliness and tardiness is the problem addressed in this paper. Idle time may be needed on the first machine due to the no-wait restriction. A model is developed that shows additional idle can be inserted on the first machine to help reduce earliness. Several dispatching heuristics previously used in other environments were modified and tested. A two-phased procedure was also developed, estimating additional idle in the first phase, and applying dispatching heuristics in the second phase. Several versions of an insertion improvement procedure were also developed. The procedures are tested on instances of various sizes and due date tightness and range. The results show the two-phase heuristics are more effective than the simple rules, and the insertion search improvement procedure can provide considerable improvements.
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|
Vir: Osebne bibliografije
in: SICRIS
To gradivo vam je dostopno v celotnem besedilu. Če kljub temu želite naročiti gradivo, kliknite gumb Nadaljuj.